The Alaska Board of Architects, Engineers, and Land Surveyors was asked several questions regarding when re-sealing drawings during construction is required. For example, are re-sealed drawings required if the design changes are outlined and contained in the change order, response to RFI, or shop drawing?
Click here to read the official response from the AELS Board.